|
The Gullewa Project is located 450 km north of Perth, 160 km east of Geraldton and 300km south west of ATW’s 100% owned Burnakura Gold Mine in the Yilgarn goldfields of Western Australia.
The Gullewa Project includes a total of 756 km2 of mineral tenements that cover the prospective central and southern portions of the Gullewa Greenstone Belt and include the Gullewa Mining Centre, the Deflector Deposit, the Prince George Mine, the Michaelangelo and Monarch Prospects.
Mining infrastructure assets of the Gullewa Project include a turn-key gold operation with a Carbon-In-Leach plant capable of up to 300,000 tpa (tonne per annum) gold production, a licensed tailings disposal facility, a 50-person camp, offices, workshops, bore fields and haulage roads. The site is currently on care and maintenance.
Photos
|

Click to enlarge
|

Click to enlarge
|
Maps

 |